Tower Bridge Pedestrian Railings

 

Rhinoceros started work today on stripping and repainting over 550 metres of pedestrian guard railing along London's best known bridge.  This work, part of Transport for London's Better Streets Programme is the finishing touch to a complete blast clean and repainting of the whole bridge carried out by Pyeroy Ltd.

latest news

New River Bridge Repairs
13.01.2021

The New River, opened in 1613, backed by James 1, was built to supply the City of London w... Read More

Lastest Case Study

Case Study: The Chine
16.07.2020

The Chine, located in the Grange Park suburb near Enfield was laid out du... Read More

Client Login