Kingsmere Subway Retaining Wall

Rhinoceros completed work today on two retaining walls on the northern approach to the Kingsmere Pedestrian Subway on the A3 at Tibbets Corner. These walls prevent the erosion of the bank into the drainage channels and footpath. In the past pedestrians, joggers and cyclists have been unable to use the subway due to flooding caused by blocked drainage channels. These walls will keep the subway open to the public and eliminate the costs previously incurred in cleaning out the drainage channels.

latest news

New River Bridge Repairs
13.01.2021

The New River, opened in 1613, backed by James 1, was built to supply the City of London w... Read More

Lastest Case Study

Case Study: The Chine
16.07.2020

The Chine, located in the Grange Park suburb near Enfield was laid out du... Read More

Client Login