Blackfriars underpass

As part of London's 2012 Olympics preparations, RHINOCEROS were brought in to tackle the cleaning and refreshing of the Blackfriars underpass at Blackfriars Bridge.  The four-day Easter Bank Holiday provided just enough time to take on the cleaning job, and since time windows were so tight the same area was simultaneously being worked on by 2 different road maintenance contractors.  Grimy concrete and brickwork is showing up well after pressure-washing and elbow-grease, and the project gives a big upgrade once finished.

       

latest news

New River Bridge Repairs
13.01.2021

The New River, opened in 1613, backed by James 1, was built to supply the City of London w... Read More

Lastest Case Study

Case Study: The Chine
16.07.2020

The Chine, located in the Grange Park suburb near Enfield was laid out du... Read More

Client Login