Rhinoceros operatives completed the installation of 150 ,metres of gutters to 7 expansion joints on the George Lane Viaduct 3April 2026. This work was carried out for Kenson Highways working for the London Borough of Redbridge. These works are part of a major refurbishment of the 100+ year old viaduct which carries George Lane over the Central Line rail tracks north of South Woodford Station.
Expansion Joint Drainage George Lane Viaduct South Woodford
Rhinoceros operatives completed the installation of 150 ,metres of gutters to 7 expansion joints on the George Lane Viaduct 3April 2026. This work was carried out for Kenson Highways working for the London Borough of Redbridge. These works are part of a major refurbishment of the 100+ year old viaduct which carries George Lane over the Central Line rail tracks north of South Woodford Station.
Previous
Previous
George Lane Viaduct Drainage
Next
Next