Notttingham Tram Poles

 

Rhinoceros completed the remedial painting of 33 overhead powerline poles on the Nottingham Express Tramways line to Station Street.

The work was carried out at night during engineering hours and the project was completed within the 18 nights as scheduled.

Our operatives worked from self propelled booms supplied by Nationwide Access Hire. We removed all of the existing failed coatings and prepared the surface to clean metal coating. The new coating system consisted of T-wash etch primer, HA item 115 Epidac 2 HB high build epoxy aluminium primer, HA item 116 Epidac 2 HB epoxy undercoat followed by Marguard Easyclean AGS a high solids two pack polysiloxane finish in NET silver.

The original coating system had failed on the 10 metre high galvanised steel power line supporting poles. We removed the existing coatings with a methylene chloride based paint stripper. This eliminated contamination of the environment and operatives from dust enabling our operatives to clean the poles back to bright metal coating.

The completion of this project on time and within budget was appreciated by the client who has promised more work of this type for 2011.

latest news

RHINOCEROS MAY NEWSLETTER
18.05.2012

Welcome to our latest newsletter featuring projects and our latest news.  Click on ... Read More

Lastest Case Study

Monument Underground: demolition and rendering
12.04.2012

Rhinoceros completed the first phase of a £1million contract to refurbish the pedest... Read More

Client Login