Windmill Road Subway

Rhinoceros complete the repair and repainting of parapet railings and timbers at Windmill Road Pedestrian and Equestrian subway. This work included the replacement of defective timber followed by sanding down to sound wood the existing timber rails, the stripping back to sound clean metal coating of all posts. All timber has been coated with 3 coats of Sikkens Cetol Woodstain which should last in excess of 7 years. Steel posts have been primed with Sigmacover 280 epoxy primer and finished with SigmaDur  550 two pack polyurethane in BS colour 14 C 40.

latest news

Folkestone Swing Bridge inspection
19.10.2018

Following final inspection of the Folkestone Harbour Swing Bridge, Rhinoceros engaged Tyne... Read More

Lastest Case Study

Harold Court Subway
27.04.2018

 The Harold Court Road subway system passes beneath the A12, just inside the M25. Dam... Read More

Client Login